The North-South Bypass Tunnel (NSTB) project in
Watch the new Ruskin video to learn more about this prestigious project.
Ruskin Tunnel Dampers on this project are rated for continuous 2-hour operation at 300 Co (572 Fo). The specification also called for factory certified testing for leakage, air performance and cycling. Ruskin is uniquely qualified to provide these services in our world famous Research & Development laboratory.
Ruskin TFD80’s are treated with a special epoxy coating and include a thermal enclosure for the electric actuators designed for this project. The dampers include full perimeter jamb seals to maximize the free area and side linkage for ease of maintenance and free of any debris that may be in the airstream. In addition, the TFD80 carries the following ratings:
The 6.8 kilometer CLEM7 will connect Woolloongabba in the south to Bowen
Hills in the north, and will be the first section of the new M7 motorway.
The tunnel will link to five existing major motorways and arterial roads on the
north and south sides of the
By 2010, its benefits to this great city will be enormous. It will bypass many sets of traffic lights, reduce travel time by up to 30%, cut fuel costs, lower stress and improve safety.
To learn more about Ruskin’s complete line of Industrial Dampers and other air and sound control products or to locate a Ruskin representative nearest you, visit our website at www.ruskin.com or call us at 816-761-7476.